Archives

Thurles Residents Angered By Planning For A 24.500 Ton Waste Collection Centre

A flooded Cabragh Business Park, at Thurles, Co. Tipperary, close to Cabragh Wetlands.

Earlier this week, we were informed by angry residents living in the Ballycurrane / Cabragh residential area of Thurles, that they have received correspondence, for the first time, regarding planning sought for a 24.500 ton waste collection centre, at Cabragh Business Park, Thurles.
Same, if planning is granted, will operate close to one of the last of Ireland’s great environmental treasures, that of Cabragh Wetlands.

The Cabragh Wetlands Trust was first registered in 1993 in an effort to save a vast area of wetland habitats from destruction, after the filling-in of settling pools by the now defunct Thurles Sugar Factory; these lagoons once were an oasis of wildlife, particularly birds. The Wetland Trust, run by volunteers, was formed; and acquired the land adjacent to the filled-in lagoons, thus ensuring the continuation of a resting place for migratory birds.

Video & Pictures courtesy G. Willoughby.

Having read the letter hereunder, you can also read some of the comments forwarded to us by the residents, same also published herewith.

Homeowner
Ballycurrane Thurles
Co. Tipperary.

Dear Neighbour,
I am writing to introduce myself and my business and also to inform you of our intention for a proposed facility at Cabra Industrial Estate and invite you to consult with us should you have any queries or concerns in relation to the proposed development.

For over 30 years, Ryan’s Cleaning, a family run business based in Thurles have been serving commercial clients nationwide, in the UK and in mainland Europe. We have an impeccable track record in business and the quality of services we deliver are to the highest professional standards.
I am proud to say we work in a highly regulated, audited and quality assured industry that has made strides over the last decade in terms of efficient performance and compliance with waste legislation.

We are accredited to the following international standard: ISO 9001, 14001, 45001 and 20121, which set out the requirements for safety, health, environment and sustainability.

Ryan’s Cleaning meets all the necessary requirements, legislation and regularly engage with stakeholders. The International Organisation for Standardisation who set the standards, externally audit our business practices on an ongoing basis to assess our performance and compliance against the relevant standards.

Ryans Cleaning has enjoyed multiple successes at the National Facility Management Awards, County Tipperary Business Awards and has been shortlisted for multiple prestigious Green Awards.

We are reaching out as we have recently applied for planning permission to operate a waste transfer station at the Cabra Industrial Estate in your area and it has come to our attention there has been some misinformation circulating which we would like to address for your peace of mind.

Below I have identified some obvious concerns that residents may have however, if you require further information on these or if you have any other queries, please don’t hesitate to contact us as we welcome consultation and engagement with our neighbours.

Please note we have a 3D model of the facility available for viewing and we can share this with you to see it for yourself, just give us a call and we can arrange same.
The planning permission sought under planning reg. ref. 21158, is to accept, sort and stream 5,000 tonnes of recyclable materials per annum.

The planning notice states the typical size of this sort of facility capped at 24,500 tonnes, however, the annual throughput of 5,000 tonnes is what has been applied for within the planning application and I have enclosed a copy of this for your comfort.

Only non-biodegradable waste types will be received at the facility such as bulky goods and dry recyclables. No domestic waste, organic waste or biodegradable type waste are to be received at the facility eliminating the source of potential odour at the facility.

All processing activities will be carried out within the building mitigating against emissions from the facility.

An Appropriate Assessment Screening for the development has been carried out to ensure the habitat at Cabra wetlands is not impacted by the development. I am pleased to inform you there would be no impact posed by our development or activities on this protected and much-loved area.

All activities will be conducted in an enclosed structure both fit for purpose and built to the highest of standards with screening and wheel washing as standard practice. The visual amenity at the site will be improved through screening of the site with landscaping and installation of trees in conjunction with appropriate maintenance of the yards and buildings.
Our family have been in business for generations and our reputation in the town, county, nationally and internationally in our industry is unrivalled. We run an extremely tight ship, always have done and always will. We have achieved and maintained the relevant ISOs for over a decade, something most in our industry operate without.

We employ local people, shop for our equipment, vehicles and supplies locally and will continue this practice to serve our local community into the future. Annually, we also supported local community groups and charities and will continue to do so.

Ryans Cleaning have been a benchmark for excellence in our field for decades. In normal times I would have liked to meet you in person however, amid restrictions this letter will have to suffice for now.

I trust the information provided herein is to your satisfaction, allay any concerns you might have regarding the proposed development and provide clarity on the annual throughput of 5,000 tonnes submitted in the planning application.

If you have any queries or require any further information, please do not hesitate to contact us at 0504-24406.

Yours Sincerely,
[Signed by Mr Pat Ryan, CEO Ryan’s Cleaning.]

Issues now angering & confusing local residents.

It would appear that Mr Ryan’s recent correspondence sent to residents in the Cabragh / Ballycurrane area raises more questions than it does answers.

Hereunder just some of the issues raised.

(1) In his letter Mr Ryan states “The planning notice states the typical size of this facility is capped at 24,500 tonnes, however, the annual throughput of 5,000 tonnes is what Ryan’s Cleaning has applied for, within the planning application and “I have enclosed a copy of this for your comfort.”

The site notice and the notice published recently in the Nenagh Guardian clearly states planning is required for 24,500 tonnes per annum, not 5,000 tonnes. This has been the only notice made available to residents and members of the public.

Mr Ryan merely takes an extract from his application to refer to 5000 tonnes, however, that is not what he applied for initially in his full submission for planning in the section 8 description of the proposed development; rather he states “the facility will not exceed 24,500 tonnes per annum”.
This is clearly not what his site notice and newspaper application states; nor what his Architectural adviser Mr Sean A. Ryan states, which was conveyed to Tipperary Co. Council in their planning application.
If Mr Ryan is only applying for 5000 tonnes, he must now amend his application to Tipperary Co. Council, as the decision is due to issue on 08/04/2021.
The residents now request that Ryan Cleaning and Tipperary Co. Council both withdraw from the planning process, until post covid-19, in the interests of equality and fairness.

(2) According to the local residents affected, Mr Ryan is informing people that Cabragh Business Park is the only available site. Residents are adamant that this is not so. They claim that Mr Ryan has acreage near his home in Borrisoleigh that he could use, away from private housing estates etc. Indeed, presently he operates out of a large factory building in an industrial estate, where he has huge sheds already constructed; ready to use, latter owned by a local Municipal District Councillor and businessman. Same if used would be away from any area of natural conservation.

(3) In his recent letter, residents point out, “An appropriate assessment screening for the development has been carried out to ensure the habitat at Cabra Wetlands is not impacted by the development. I am pleased to inform you there would be no impact by our development or activities on this protected and much loved area.”

Residents state that the assessment makes no mention of Cabragh Wetlands, it states “no impact on the River Suir”. It also fails to mention that an existing waste facility is already up and running next door to his own site. It states that the nearest house is 400 metres away, which residents claim is totally untrue.
It states the area is non residential; light industrial; with no traffic impact. Residents claim no suitable/proper Environmental Impact Assessment (EIA) has been in fact conducted.

(4) “We are reaching out……. and it has come to our attention there has been some misinformation, which we would like to address for your peace of mind.”

Mr Ryan does not state what he means in this extract above. There is no misinformation according to residents.

(5) “We welcome consultation and engagement with our neighbours. We have a 3D model of the facility available for viewing and we can share this with you.”

Mr Ryan is asking us to visit his offices, that you can’t go into because of National Public Health Guidelines regarding social distancing. Why did Mr Ryan not consult the residents, pre his original application?
In reference to his last paragraph, “in normal times” etc; residents point out that these are not normal times, we are experiencing a pandemic, a public crisis, there has been a Government lockdown since December last; schools are closed; attendance at outdoor funerals is curtailed to 10 family members; we can’t go anywhere; we are told to stay at home etc.

The anger and discontent within the town of Thurles is now greatly heightened according to the residents, with whom we corresponded.

Parnell Street Car Park Thurles – Latest Dumping Ground.

Parnell Street car park can be located directly opposite the Office of Mr Jackie Cahill TD, in Parnell St, Thurles, Co. Tipperary, [E41 VY66].

Currently this Parnell Street car park, with its torn up surface and muck, is reminiscent of an unoccupied slum area.
For all intents and purposes and in every practical sense, same is virtually now a refuse packed ghetto, with responsibility for its present deplorable state, the remit of Thurles Municipal District council. It is to the latter, as residents and business people, we pay our high Rates and Local Property Tax (LPT).

We watched yesterday, as civic minded individuals arrived with their boxes and bags of glass bottles; to file in the various glass containers. As you can see from the picture, all glass containers are packed to capacity and have been for weeks.

While some individuals returned home with their recyclable glass, others left same neatly on the ground in paper bags and loose; in the centre of already smashed glass, from glass containers which had previously fallen from the existing overloaded bins.

We learned recently that Tipperary Co. Council spent €50,000 removing litter left by fly-tippers. One wonders how many glass containers were thrown out of car boots into ditches and hedges, as individuals headed for their homes yesterday, unable to recycle their glass, under the promised glare of CCTV cameras.

Thurles now has three dumps, with a fourth dump expected to carry a further 24,500 tons of waste, currently being worked on, in anticipation of supported planning permission.

Proof That Waste By Tipperary Co. Council Continues

We joked about it first on September 17th, 2018. Now 2 years and almost 5 months later, it has finally happened.
Heavy vehicles, in the coming days, can soon hopefully travel without obstruction or other hinderance; same caused by the stupidity of Council road engineers.

Road junction structure first introduced in September 2018, at the junction of Clongour Road and Slievenamon Road.

But just how much of taxpayers money has been wasted by these same Tipperary County Council officials, led by Tipperary Chief Executive Mr Joe MacGrath and Mr Marcus O’Connor (Director of Services Roads, Transportation, Infrastructure).

Same junction at Clongour Road and Slievenamon Road being properly realigned today, February 22nd, 2021, but at what cost to Thurles taxpayers?

Perhaps latter named gentlemen would like to inform our paid, elected, public representatives at the next online meeting of Council reps, or perhaps Mr Jackie Cahill or Mr Michael Lowry could find out through a freedom of information request, while condemning the wanton waste.

Meanwhile, the waste continues within the town, as a ‘not fit for purpose Thurles Chamber of Commerce’ also remains in hiding, incapable of supporting Thurles business interests.

Planning Application For 24,500 Ton Recycling Dump In Thurles Launched.

The planning application by Ryan Cleaning Event Specialists Ltd, for a 24,500 tonnes, per annum, waste facility, close to an already granted 5,000 ton facility, both to be located at Cabragh Business Park in Thurles, can now be viewed in detail.

Click HERE to view in full and having opened the online page: –
Next – Go to pale green tab centre marked ‘View scanned files.’
Next – Click on box centre of uploaded page, marked ‘I Agree‘ and then click on ‘View Files‘.
View the relevant Planning Application data, by clicking on the various blue ‘JPEG View‘ links right of image.

Do remember that the file number assigned to this planning application is 21158.

Planning Application States.

Development Address: Cabragh Business Park, Ballycurrane, Thurles, Co. Tipperary.

a) a single storey material recovery and transfer facility building (of floor area 1031 m sq).
b) a single storage detached prefabricated office building (floor area 60 m sq) with signage on both buildings.
c) vehicular access to the site is via the as constructed existing entrance.
d) a service yard with vehicle weighbridge and vehicle washing area with the site.
e) on-site staff and visitor car parking and truck parking areas.
f) all necessary ancillary site development works to facilitate this development with boundary treatment and landscaping.
g) all associated site works consisting of petrol interceptor and silt traps and connection to existing septic tank and upgraded percolation area with all associated site works (the application relates to an activity requiring a waste facility permit from Tipperary County Council, the waste tonnage for acceptance and handling at the facility will not exceed 24,500 tonnes per annum).

For the many angry local residents, with young families, now residing and paying heavy mortgages; who have contacted Thurles.Info, and who are living in the immediate area of the Cabragh Business Park; you can find more information on the planning application process, by visiting HERE.

It is expected that local councillors (especially those with a financial interest), will support this planning application, thus turning Thurles into a dumping ground, with waste from neighbouring counties being dragged through and stored in the centre of a residential area.

Residents should now write to both local TD’s, namely Mr Lowry / Mr Cahill and to all Thurles Municipal District Councillors asking: – (A) Do they hold any financial interest in either dump, present or purposed, within the Cabragh Business Park venue, which we understand is also being used temporarily, by yet another independent recycling group, namely Ryan Brothers, Mill Road? (B) Will they commit to opposing any other such planning licence, now and into the future?

EPA Continued Essential Environmental Enforcement During Covid-19 Pandemic.

EPA continued to provide essential environmental enforcement activities during the Covid-19 pandemic using innovative approaches.

  • The EPA employed a range of tools to assess compliance at licensed sites during 2020 and throughout the Covid-19 pandemic, including the innovative use of Remote Compliance Assessments.
  • Odour complaints about licensed facilities rose dramatically in 2020, peaking in April. Overall, there was a 92% increase in complaints received by the EPA.
  • The EPA continued to carry out inspections focusing on sites causing odour nuisance and on other sites where environmental incidents and emergencies occurred.
  • The top 5 most visited sites in 2020 were Tipperary Co-operative Creamery Limited (19), Arrow Group (20), Merck Millipore Limited (21), Green Circular Economy Unlimited Company (24) and Limerick Gasworks (30).
  • Twelve sites were identified as National Priority Sites in 2020, an increase from the eleven sites in 2019. Five of the 2019 sites were again designated a National Priority Site in 2020. Three sites (Arrow Group, Arran Chemical Company Limited and Tipperary Co-op Creamery) were a National Priority Site throughout 2020.

The Environmental Protection Agency (EPA) published its annual summary report on the enforcement activities carried out in 2020, along with the list of sites which were designated as a National Priority Site during the year.

The report shows that, despite the significant challenges and impact of Covid-19 during 2020, the EPA continued to carry out the enforcement of industrial and waste licences at over 830 individual installations throughout Ireland.

Mr Tom Ryan, Director, EPA Office of Environmental Enforcement, said:

“The EPA continued to provide an essential public service throughout the pandemic carrying out just under 1,100 inspections. With complaints about local licensed facilities almost doubling, the role of the EPA in enforcing industrial and waste licenced activities became even more important and we continued to investigate and respond to complaints as they arose. Odour nuisance was a key issue and 13 per cent of all inspections in 2020 were to investigate odour complaints from the public.”

The report published today highlights the main issues at licensed sites during 2020 and outlines what actions the EPA took to enforce environmental conditions at these sites.

During 2020, the EPA published quarterly updates on its enforcement activities to keep the public informed of the work of the EPA. The main findings of the 2020 report were:

  • 1,089 inspections were carried out by the EPA of which over 200 were remote compliance assessments. 14 per cent of these inspections were to sites on the National Priority Site List.
  • The top 5 most visited sites in 2020 were Tipperary Co-operative Creamery Limited (19), Arrow Group (20), Merck Millipore Limited (21), Green Circular Economy Unlimited Company (24) and Limerick Gasworks (30). The majority of inspections on these sites were to investigate odour issues.
  • Complaints to the EPA about licenced sites increased by 92 per cent and peaked in April when 187 complaints were received. The EPA received more than 100 complaints in relation to Arrow Group, Gas Networks Ireland, Tipperary Co-op Creamery and Merck Millipore Ltd.

The EPA also published the latest National Priority Sites List for 2020. The number of National Priority Sites in 2020 was 12, up slightly when compared with 2019 (11). The EPA will continue to focus its resources where they are most needed and to drive compliance at all problematic sites.

Commenting on the publication of the latest National Priority Sites List, Mr. Darragh Page, EPA Programme Manager, said:

“Sites with significant non-compliances with their licence conditions and regular incidents and complaints are placed on the National Priority Sites List. The continued poor compliance status and presence of the Arrow Group and Arran Chemical Company Limited on the National Priority Sites List is of serious concern to the EPA and they are both the subject of ongoing enforcement action to resolve the environmental issues and to bring them into compliance.”