Archives

Major Funding Secured For New 5 km Thurles Loop Walk.

€447,300 awarded to extend walking route via Mill Road, in Thurles.

It is with great pleasure that the community of Thurles welcomes a landmark advancement in local amenities: a generous fund of €447,300 has now been secured by Thurles Lions Club to realise the long-awaited 5 km looped walk extension, starting from the heart of Thurles town-centre before meandering along the N62 national route to the “Lady’s Well” path stile entrance, positioned some 100 metres north of Thurles Golf Club. By following Lady’s Well main path, the rambler will then join the route at Mill Road (formerly Manor Mill Road, latter the ‘rat run’ or current inner relief road, for vehicles avoiding Thurles town) and the road locally known, affectionately, as “Fat Arse Boulevard”.

This funding is part of a number of Tipperary projects that have been allocated more than €900,000 between them to improve outdoor recreation facilities, is a minor part of a national fund of €16.5 million for 63 projects.

Footpath plans advance for Mill Road in Thurles.

Following the first publication of the planning application by Tipperary County Council, on 24th July 2024, same seeking the installation of a footpath on the Mill Road corridor, the project has now progressed significantly. Land access has been graciously granted by local residents along Mill Road, with, we understand Tipperary Council bearing the cost of acquisition. This co-operation paves the way for the looped walk to become a safe, well-designed pedestrian route for the community.

When complete, the new path will link the town centre securely with the outskirts of the town, via an attractive, town-to-country route, promoting greater recreational walking, better access for all ages, and contributing to the well-being and amenity of the Thurles area.
Observers have welcomed the scheme as a vital safety upgrade, especially along Mill Road, where pedestrian access had long been compromised by traffic speeds and inadequate parking provision.

When the local TDs catch wind of this scheme, their press releases will no doubt exclaim with great gusto how utterly thrilled they are to have “secured” this funding, for a project they only discovered existed yesterday via their inbox.

This awarding of funding marks a significant milestone, after one year and three months since the application’s initial publication, and confirms a concrete step towards long-envisioned connectivity for the region. Next steps will include detailed design, boundary works, signage, landscaping (including new native hedging) and final construction of the concrete 1.8-metre wide footpath along the route from the existing built-up path towards the bridge at Lady’s Well.

Residents, walkers, cyclists and families in Thurles now have cause to look forward with genuine excitement, the promise of “Fat Arse Boulevard” becoming a cherished walking loop is now indeed on its way to realisation.

Residents can find, view and download the initial plans and reports HERE. (Scroll to the bottom of the link provided).

Facebooktwitterlinkedinmail

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  

  

  

This site uses Akismet to reduce spam. Learn how your comment data is processed.