Archives

Thurles, Co. Tipp: Where Road Signs Take The Hits And Relief Roads Take Forever.

Thurles, Co. Tipperary has apparently developed an innovative transport policy; to force enormous juggernauts through streets designed when the principal form of heavy traffic had four legs and ate hay.

Available to view on Mill Road, Thurles, one of two signs within metres of each other, originally warning of a dangerous junction and dangerous bends.
Pic: G. Willoughby.

The predictable result can be seen in the accompanying, undeniable video shown hereunder; for months damaged signs, battered street furniture, demolished walls, uprooted and dinged bollards and not surprisingly yet another enormous bill waiting for the over-stretched ratepayer.

If the claim that 90% of signs are seriously damaged is to be stated as fact, Tipperary County Council should immediately conduct and publish a proper survey.
What is already beyond dispute is that the council; not passing motorists or magical road-sign fairies, is totally responsible for maintaining signs on local and regional roads.

Video courtesy of G. Willoughby. (Feel free to copy/share).

Local residents may know every turn in Thurles by instinct, by memory and generations of experience, but tourists, delivery drivers and other non locals do not.
They depend on clear, visible signs to identify directions, restrictions and hazards.

Damaged or unreadable signage is therefore more than an embarrassment; it creates a genuine road-safety concern, particularly where unfamiliar drivers must make sudden decisions while navigating narrow, heavily trafficked streets. The Road Safety Authority expressly identifies regulatory, warning and information signs as essential guidance for tourists using Irish roads.
Visitors should receive directions, not an unscheduled navigation exam, with a juggernaut approaching from the opposite direction.

For years, Thurles residents have heard about an Inner Relief Road and an Outer Bypass.
The council’s 2024 – 2030 Local Area Plan still describes both as projects for which funding must be secured. The Inner Relief Road alone is intended to provide a 1.1-kilometre connection between the N62 and Mill Road, while the proposed bypass would link the N62, N75 and R498.

In 2025, only €100,000 was allocated to progress the Inner Relief Road’s detailed design. That is progress in the same sense that buying a doormat means your house is nearly built.

Mr Michael Lowry TD, Mr Alan Kelly TD and Mr Ryan O’Meara TD must now provide the public with something more useful than announcements, photographs and recycled assurances.

The evidence for action is already visible on the road. Official data published for the N62 at Turtulla records an average of 9,539 vehicle movements every day.
More importantly, Tipperary County Council’s own Thurles Local Transport Plan concludes that the proposed road schemes would reduce total traffic in the town-centre core by approximately 20%, cut traffic crossing the River Suir bridge by more than 50%, and reduce town-centre heavy-goods traffic by approximately 50%.

The same plan states that roughly three-quarters of the predicted reduction would involve strategic traffic that neither begins nor ends its journey in Thurles. Vehicles presently passing through the town would use a suitable alternative route which presently does not exist. These are not speculative complaints, they are the council’s own measurements and modelling, providing compelling evidence that the relief road and bypass are necessary for safer streets, more reliable commercial access and a town centre that can perhaps function more effectively.

Thurles Needs Immediately:-

A confirmed and fully funded delivery programme for the Inner Relief Road.
A published timetable for the bypass.
A professional audit of damaged signs and street furniture.
A costed plan to prevent heavy vehicles repeatedly causing further damage.
Clear public reporting of who sought funding, when it was sought and what response was received.

Thurles residents have waited long enough. They deserve proper engineering, funding and dates, not another series of ceremonial announcement that the announcement of a future announcement is progressing according to plan.

Facebooktwitterlinkedinmail

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  

  

  

This site uses Akismet to reduce spam. Learn how your comment data is processed.